Short-process Steel Plant | SME Steel Projects

Short-process Steel Plant

Short-process Steel Plant

The prerequisite of the project shall have reliable energy supply (water, electricity, fuel) and land resources. Then the project owners must carefully plan the factory and set its capacity, raw material, products and process.

SME specializes in the metallurgy industry, especially in the steel Turnkey or EPC project. We have built many plants or various steel product lines in dozens of countries. We also help some clients install proper products and processes based on economy, low cost, high yield principle. If you want to install a short-process steel plant, you shall provide the specific data of some items below to the project planner.

Turnkey steelmaking project

  1. Planned annual capacity
  2. Raw material type (scrap, DRI, or other)
  3. Steel grade
  4. Product specification (section size, cut-length size)
  5. Product standard
  6. Plant incoming voltage
  7. Available land area

Turnkey hot Rolling project

  1. Planned annual capacity
  2. Raw material type and size
  3. Product standard
  4. Product specifications
  5. Product mix
  6. Fuel type
  7. Available land area

Another tube line needs to be given wall thickness of tube; strip or sheet line shall mention requirements of single coil weight, inside and outside diameter of single coil.

In these key factors products specifications maybe be considered carefully. If total plant scale is small, it isn’t economic and practical to ask the production line meets multi-size products, for example, a 50000TPA rebar line for ?8~?12 rebars is more suitable; we generally combine products and process to comprehensive consideration.

SME design team has rich steel projects experience on planning green plants and upgrading existing plants aspects, thus if you are interested in steel plant project, welcome to contact us.

Leave A Comment